Sunday, January 29, 2023

A HUGE PROJECT!

 It was a HUGE project, but LaVerl and Randell got it done!! A new sewer system at our Lake house at Roosevelt. They worked so hard!

The 'Before' pictures. They had to dig a new line for sewer and water lines from the house all the way down the hill to the bottom.

They even ran new lines over to this little boat shed so if we decide to build something here, we can.


The old sewer line coming out from the house was clogged with roots that had grown in there and who knows what else.
LaVerl moved Kirk's boat shed back about 3 feet, but then Randell picked it up with his back hoe and moved it way over to the concrete pad, out of the way so he could dig for the leach lines.
We had to tear up all our nice walkways.
Randell arriving with his dump truck and backhoe.
The digging begins.


Out with the old, in with the new!








This was always a mud hole where the water faucet was, so LaVerl put in pipes for the water to drain away and moved the the old faucet over and put in a frost free one.





Yay!! New septic tank in!!